Surface dressing

Contents


What to expect during work

Generally, work will be carried out between 8am and 6pm.

There will be no on street parking during these times.

Vehicle access to properties will be possible most of the time during the works, but you may experience delays while the work is either in progress or immediately after the material has been laid.

Please drive slowly whilst travelling through the site. This is to protect our employees and your vehicle.

Pedestrian access to properties will be maintained throughout the works.

Our employees on site will be happy to help if you need assistance.

The material will remain wet for between 15 and 40 minutes after it has been laid, depending on the temperature and humidity.

Please do not drive or walk over roads sprayed with bitumen emulsion until the surface chippings have been spread.

For a short time, particularly if the weather is warm, there may be small areas of bitumen that are still soft.  Please take care.  If you have to walk on the new surface please check your shoes before entering the house or getting into your car. Pets should also be checked for any sticking bitumen.